How to Drain and Refill Your All-In Commercial Max

Tubs Compatible With These Instructions:

  • Plunge All-In Commercial + Auto Doser
  • Plunge All-In Commercial Max

Drain & Refill Your Plunge

DO NOT drain your Plunge while your Plunge is paused. You must power down the Plunge when draining and refilling. The chiller can be damaged if it unpauses while empty and this will void your warranty.

  1. Pause the Plunge and wait for the jets to turn off
  2. Turn off the Plunge by unplugging the power cord or pressing the “test” button.
  3. Close the two colored ball valves (perpendicular to the piping). Important note: Do not open the colored ball valves during the draining process to protect the Auto Doser Probe from air exposure and drying out. 
  4. Remove the ventilation screen on the side opposite of the filter housing. 
  5. Remove the cap from the drain spigot
  6. Attach a garden hose to the drain spigot
  7. Turn the white ball valve on the drain spigot on (parallel to the piping) and the water should flow out. Note: gravity and length of the hose will effect how quickly the water drains out. 
  8. Replace the cap after draining
  9. Take this time while the Plunge is empty to clean the drain strainers by following these instructions.
  10. Refill the Plunge and follow the initial setup instructions

Refilling Frequency Requirements:

Please note: If you do not follow the frequency requirements for your tub setup your warranty could be voided. 

  • Plunge All-In Commercial + Auto Doser - Every 2 months at minimum
  • Plunge All-In Commercial Max - Every 2 months at minimum

 

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request

Comments

0 comments

Please sign in to leave a comment.